Project Challenge
The drilling alignment had to avoid existing underground utilities and pipelines that constrained the available route.

02
Underground Power Infrastructure
Underground power duct construction by HDD
Project Scope
The drilling alignment had to avoid existing underground utilities and pipelines that constrained the available route.
The drilling route was planned using survey information and actual site conditions to maintain alignment control and reduce risk to existing utilities.